Where FARIS is going
0.2 added computed maintenance durations: replacement outages worked out from the decay heat of the parts around each replaced component, through ACTINV. Next, on the same study:
- ARC-fitted geometry. Separate inboard, outboard and vertical thickness for every layer, using the published ARC radial build. It adds 18 discrete TF coils, a double-null divertor, several ports, and cross-section and radial-build views. FARIS can then be compared with the published ARC magnet lifetime (at least 9 full-power years to 3 × 10²² n/m²; Sorbom et al. 2015), and the computed outages with ARC’s own maintenance durations.
- Peak magnet fluence. Variance reduction aimed at the magnet (FW-CADIS weight windows), so the local peak is reported alongside the regional averages.
- Faster maintenance runs. Most of the run time is ACTINV loading its data for each short cooling run; batching them in one ACTINV process could remove most of that.
- Dose and remote handling. A tested rule for timing maintenance on contact dose with remote handling, and material impurities bounded per ppm.
Your own design from CAD is on main and in the next release: faris design init, check and transport take a STEP file with a design file naming each solid’s material and role, and the desktop app has Design check and Design flux windows (design file guide). Not yet on a CAD design: sweeps and shutdown dose. Further out: shutdown dose. The plan and its decisions are in the demo roadmap.
Measurable goals for every part of FARIS are in the requirements.